  • Project's Title 230 KV Electrical Substation for Stage -1 of Jubail -2
  • Contract Number NCC-T&D/RC/ 071-C11/W0/02
  • Client Saudi Electric Company/ Royal Commission
  • Consultant SEC/RC
  • Value of the Project 58,000,000.00 SR
  • Time Frame 1st July 2006 till 20th November 2008
  • Location of Project Jubail, K.S.A.
  • Highlights Construction Of Entire 230/115/34.5 Kv & Control Building

Jubail Substation

Construction of Substations 230 Kv & 115 Kv, GIS Buildings and 34.5 Kv Switchgear building, control building and complete civil, small power and mechanical works and site development works.

Key Features of the Project

  • Construction of Substation at jubail-2, including construction of yard development of 50,000 sqm, Site Development, Back filling of 3m deep in average, Asphalting and line markings
  • Precast boundary walls above the retaining walls of App. 900lm.
  • Construction of Control Building, Construction of 230kv & 115kv GIS Buildings and 34.5Kv Switchgear Buildings, Construction of guard house including but not limited to all the works such as civil, architectural, electrical, mechanical for basement and Ground floor.
  • Duct banks for all the MV and LV cables and cable trenches, power Transformer foundations, station service transformer foundations, AACU foundations etc
  • Manholes, hand holes, wing walls, Fire walls, septic tank, seepage pits, Gantry foundations with piling, foundations for surge arrestors, bus ducts etc, lighting poles, lightening masts etc.
  • Portable Water System, drainage water system, internal plumbing works for toilets and battery rooms
  • This project is one of the first substations with 24m span of control building which we have provided with precast double Tee solution and have installed within 24 hours