  • Project's Title RTR Piping works for Khurais Central Processing Facilities Project
  • Contract Number 405660
  • Client ARAMCO & HYUNDAI
  • Consultant SAUDI ARABIAN SAIPEM LIMITED
  • Value of the Project 2,000,000.00 SR
  • Time Frame 1st December 2008 till 31st March 2009
  • Location of Project Khurais, K.S.A.
  • Highlights RTR Piping Works

Khurais Central Gas Processing Facilities

RTR Piping works for Khurais Water Injection & Utility Facility SAUDI ARAMCO project, HYUNDAI ENGINEERING as main contractor to build Gas processing trains, ETE's job includes but not limited to Whole RTR and its related works.

Key Features of the Project

  • Fabrication of RTR Piping
  • Erection of RTR Piping
  • Hydrostatic test of RTR Piping
  • Execution of all related tests and checks as per technical project information and applicable company standards
  • Above-ground RTR piping with a diameter less then 2" of any wall thickness and material
  • Above-ground RTR piping with welded / fixed pieces, fittings, tees, elbows, Flanges, Valves, weldolet, threadolet etc.
  • Modification of RTR piping and repair works